Systems engineering Work breakdown structure, Dynamic programming, Control engineering, Design of experiments, Middleware, System lifecycle
| Publisher: | Unknows |
| Published In: | 25-Jun-2011 |
| ISBN-10: | 115687033X |
| ISBN-13: | 9781156870334 |
| Binding Type: | Paperback |
| Weight: | 497 gms |
| Pages: | pp. 240, 50:B&W 7.44 x 9.69 in or 246 x 189 mm (Crown 4vo) Perfect Bound on White w/Gloss |
The Title "Systems engineering Work breakdown structure, Dynamic programming, Control engineering, Design of experiments, Middleware, System lifecycle" was published in the year 2520. The ISBN number 115687033X|9781156870334 is assigned to the Paperback version of this title. This book has total of pp. 240 (Pages). The publisher of this title is Unknows. Systems engineering Work breakdown structure, Dynamic programming, Control engineering, Design of experiments, Middleware, System lifecycle is currently Not Available with us.You can enquire about this book and we will let you know the availability.