Systems Engineering Work Breakdown Structure, Dynamic Programming, Control Engineering, Design of Experiments, Middleware, System Lifecycl
| Publisher: | Unknows |
| Published In: | 12-Sep-2013 |
| ISBN-10: | 1230613382 |
| ISBN-13: | 9781230613383 |
| Binding Type: | Paperback |
| Weight: | 497 gms |
| Pages: | pp. 240, 50:B&W 7.44 x 9.69 in or 246 x 189 mm (Crown 4vo) Perfect Bound on White w/Gloss |
The Title "Systems Engineering Work Breakdown Structure, Dynamic Programming, Control Engineering, Design of Experiments, Middleware, System Lifecycl" was published in the year 1220. The ISBN number 1230613382|9781230613383 is assigned to the Paperback version of this title. This book has total of pp. 240 (Pages). The publisher of this title is Unknows. Systems Engineering Work Breakdown Structure, Dynamic Programming, Control Engineering, Design of Experiments, Middleware, System Lifecycl is currently Not Available with us.You can enquire about this book and we will let you know the availability.